01
Discover
Confirm fab objectives, transport equipment, host-system boundaries and success criteria.
Every rollout is shaped around production constraints, integration scope and the operational team.
Confirm fab objectives, transport equipment, host-system boundaries and success criteria.
Define the system architecture, interfaces, availability plan and validation strategy.
Connect equipment and upstream systems; configure dispatching rules and simulation scenarios.
Run functional, exception and performance tests with the project team before production use.
Support cutover, operational monitoring and continuous improvement after launch.
We simulate a day of transport volume on your actual layout and hand back a bottleneck analysis. Around 45 minutes.