Every wafer,
on time.
YUAN JIE MCS (Material Control System) automates and governs every transport between OHT, AGV, stocker and tool on your floor. Millisecond dispatch decisions, standard SECS/GEM integration and a fully traceable transport history — so the line never stops waiting for a vehicle.
The line rarely stops
because of the tool.
In most plants transport is reactive: the tool calls for material, a human dispatches, vehicles queue. By the time transport becomes the bottleneck, the capacity is already lost.
One system for every movement on the floor.
The layer between MES and the floor.
MCS takes transport demand from MES above and drives OHT, AGV and stockers below. Equipment differences collapse into one abstraction, so changing vehicle vendor or tool model never reaches your upper systems.
Specification and deployment.
The full specification sheet and readiness checklist are available after a demo.
A rollout built around production.
Start with the traffic your floor already has. Each stage produces a practical decision point before the next one begins.
Meet the problem where it is.
Questions teams ask before a site survey.
What should we prepare for a first session?
A current layout, a typical day of transport orders and a high-level equipment list are enough to start the conversation.
Can MCS be introduced in phases?
Yes. The rollout can be scoped by building, line or equipment group so teams can validate each phase before expanding.
Does the system require replacing existing controllers?
No. MCS is designed to sit between MES and floor equipment, preserving the controllers and protocols already in use.
See a dispatch run
before you talk rollout.
We simulate a day of transport volume on your actual layout and hand back a bottleneck analysis. Around 45 minutes.
